Mallinckrodt NPB-190 Manual del operador Pagina 17

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 87
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 16
SETUP
Unpacking and Inspection
Performance Verification
List of Components
Monitor Setup
Language Selection
Tilt-Stand Supports
UNPACKING AND INSPECTION
Notify the carrier if the shipping carton is damaged. Unpack the
NPB-295 and components. If anything is missing or damaged,
contact Mallinckrodt’s Technical Services Department or your
local Mallinckrodt representative.
PERFORMANCE VERIFICATION
Before using the NPB-295 for the first time in a clinical setting,
you must verify that the monitor is working properly as described
in the Power-on Self-test paragraph of the Start-up and Use
section. If the monitor does not operate properly, refer to the
Troubleshooting section. If you cannot resolve the problem,
contact qualified service personnel or your local Mallinckrodt
representative.
LIST OF COMPONENTS
1 Nellcor NPB-295 pulse oximeter
1 Hospital-grade power cord
1 Nellcor Sensor or ASP-3 assortment pack
1 Nellcor pulse oximetry cable, Model MC-10 or SCP-10
1 Pair of tilt-stand supports
1 Operator’s manual
2 Fuses, 0.5 Amps, 250 Volts
11
Vista de pagina 16
1 2 ... 12 13 14 15 16 17 18 19 20 21 22 ... 86 87

Comentarios a estos manuales

Sin comentarios